Herunterladen Inhalt Inhalt Diese Seite drucken

ABB ACH580-34 Kurzanleitung Für Die Installation Seite 7

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 23
Move the drive to the installation site and unpack it
5
22
7
3
15
18
1
19
20
Step
1
Finger guard
2
Pedestal guide plate for the LCL filter module
3
Pedestal guide plate for the drive module
4
Accessories box
See the box contents on the following pages.
5
Center of gravity symbol
6
Package for LCL filter fan
7
Package for LCL filter pedestal
8
Telescopic extraction/installation ramp
9
Package for option +H370: Full-size input power cable connection terminals and PE busbar.
10
Plywood support
11
With standard drive module configuration: Clear plastic shrouds box and output cable connection
terminals box.
With option +H370: Also Input cable connection terminals box. See the box contents on the
following pages.
12
Lid for sleeve
13
Cardboard sleeve
14-16
Cardboard support
17
Pallet
18
Strap
12
13
2
9
6
4
11
8
16
14
21
10
17
Transport package contents
EN – Quick installation guide 7
3AXD50000174287_20210204
EN
DA
DE
ES
FI
FR
IT
PL
PT
RU
SV
TR
ZH

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis