Herunterladen Inhalt Inhalt Diese Seite drucken

Recommissioning - Stromag KMB-ZM Serie Montageanleitung

Druckmittelgeschaltete lamellen-federdruckbremse
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7.5

Recommissioning

Flush the pres-
surised medium
system after
maintenance
When the pressurised medium system is flushed by the customer, this may cause contamina-
work
tion of the pressurised medium. This must not enter the brake.
► The pressurised medium system must be flushed by the customer before being connected
to the brake.
1. Flush the entire pressurised medium system before connection to the brake.
Recommission-
1. If necessary, flush the entire pressurised medium system before connection to the brake,
ing
see above (flushing the pressurised medium system after maintenance work).
Other measures for recommissioning are not necessary.
30
Mounting instructions Pressure-operated spring-actuated multi-disc brake KMB-ZM, KLB-ZM • No. 777-00001 D • 10/2017
NOTICE
Damage to the brake due to contaminated pressurised medium

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Klb-zm serieKmb 1 zmKmb 2 zmKmb 12 zm

Inhaltsverzeichnis