Herunterladen Inhalt Inhalt Diese Seite drucken

Packaging; Starting, Operation - WIKA E-10 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für E-10:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5. For your safety / 6. Packaging / 7. Starting, operation
Consider the details given in the EC-type examination certificate as well
as the respective specifications for explosion hazard use of the country
concerned (e.g.: IEC 60079-14). If you do not observe these stipulations,
Warning
serious injuries and/or damage can occur.

. Packaging

Has everything been supplied?
Check the scope of supply:
Completely assembled pressure transmitters; with flush version E-11 including pre-
assembled sealings and protection cap.
Inspect the pressure transmitter for possible damage during transportation. Should
there be any obvious damage, inform the transport company and WIKA without delay.
Keep the packaging, as it offers optimal protection during transportation (e.g. chan-
ging installation location, shipment for repair).
Ensure that the pressure connection thread and the connection contacts will not be
damaged.
In order to protect the diaphragm, the pressure connection of the instrument E-11 is provided
with a special protection cap.
Remove this protection cap only just before installing the pressure transmitter in order
to prevent any damage to the diaphragm or the thread.
Keep the protection cap of the pressure connection thread and the diaphragm for
later storage or transport.
Mount the protection cap when removing and transporting the instrument.

7. Starting, operation

Required tools: wrench (flats 27), screw driver

WIKA Operating instructions/Betriebsanleitung E-10, E-11
GB

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

E-11

Inhaltsverzeichnis