Herunterladen Inhalt Inhalt Diese Seite drucken

Elcon Nect next BIG 101 Serie Bedienungsanleitung Seite 39

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

BIG 101x
Designation
PCS sync
PCS sync
PCS sync
LAN-PORTS
disconnect
LCT-Link
LAN-Link
Fault signalling
1 Link down (PAF4)
all Links down
internal error
Software update
Download
Flash programming
Version: 2010/12/01
Operating status
LINK (WAN)
Power
Alarm
LINK
(yellow)
(red)
(green)
ON
flashes
ON
at 1 Hz
or ON
ON
flashes
ON
at 1 Hz
or ON
ON
OFF
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
flashes
ON
all LED are ON and they are switched off
in clock-wise direction
Table 2: LED signalling part 2
LAN
Status
LAN
Status
(yellow)
(green)
(yellow)
ON
OFF
OFF
OFF
OFF
ON
ON
ON
ON
flashes
flashes
flashes
Remarks
min. 1 SHDSL-
Line of the EFM-
Bonding Group is
synchronized
IP-address not yet
assigned
all SHDSL-Lines
of the EFM-
Bonding Group
are synchronized
IP-address not yet
assigned
all SHDSL-Lines
of the EFM-
Bonding Group
are synchronized
IP-address as-
signed
LAN-LED flash-
es upon data
transfer
LAN-LED flash-
es upon data
transfer
Initial situation
39

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Elcon Nect next BIG 101 Serie

Inhaltsverzeichnis