Herunterladen Inhalt Inhalt Diese Seite drucken

Construction Of The System With Bam Gm-Ml-01-C04 Slide - Balluff BML-R01-M Serie Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
BML-C01, BML-C02, BAM GM-ML-01-C04, and BML-R01-M_ _ _
Slide/Slide Rail - Guided Magnetic Tape Position Measuring System
3
Construction and function (continued)
3.3
Construction of the system with
BAM GM-ML-01-C04 slide
BML-R01-M... slide rail
Mounting holes for drag chain
(e.g. from IGUS)
Magnetic tape/cover strip
Fig. 3-3:
Construction of the BAM GM-ML-01-C04 guided magnetic
tape position measuring system
System components:
Slide
BAM GM-ML-01-C04
Slide rail
BML-R01-M_ _ _
Magnetic tape
BML-M02-A55-A_-M_ _ _ _-E
Sensor head
BML-S1G0-...
Accessories
(See section 6)
Lugs
BML-Z0008
Joint rod
BTL2-GS10-_ _ _ _ -A
Installation aid
BML-Z0010
8
english
BCC M41C-0000-1A-169-PS0C08-_ _ _-C009 connector
BAM GM-ML-01-C04 slide
BML-S1G0-... sensor head
Fixing of the BTL2-GS10-....
joint rod
Note
The magnetic tape and sensor head must be
adjusted to each other.
BML-Z0008 lugs

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bml-c01Bml-c02Bam gm-ml-01-c04

Inhaltsverzeichnis