Herunterladen Inhalt Inhalt Diese Seite drucken

Construction Of The System With Bml-C02 Slide - Balluff BML-R01-M Serie Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
BML-C01, BML-C02, BAM GM-ML-01-C04, and BML-R01-M_ _ _
Slide/Slide Rail - Guided Magnetic Tape Position Measuring System
3
Construction and function (continued)
3.2

Construction of the system with BML-C02 slide

BML-R01-M... slide rail
Mounting holes
for drag chain (e.g. from IGUS)
Fig. 3-2:
Construction of the BML-C02 guided magnetic tape
position measuring system
System components:
Slide
BML-C02
Slide rail
BML-R01-M_ _ _
Magnetic tape
BML-M02-I...
(with or without cover strip)
Sensor head
BML-S1F1-...
Accessories
(See section 6)
Lugs
BML-Z0008
Joint rod
BTL2-GS10-_ _ _ _ -A
Installation aid
BML-Z0010
www.balluff.com
Fixing of the
BML-C02 slide
BTL2-GS10-.... joint rod
BML-S1F1-... sensor head
Note
The magnetic tape and sensor head must be
adjusted to each other.
BML-Z0008 lugs
Magnetic tape/cover strip
english
7

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bml-c01Bml-c02Bam gm-ml-01-c04

Inhaltsverzeichnis