Herunterladen Inhalt Inhalt Diese Seite drucken

Unpacking; Installation Area - Corghi ERCO X4300 Serie Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

3
4

UNpaCKING

After removing the packaging make sure that the equipment's various components are
undamaged, by checking that there are no visibly damaged parts (control unit, lift struc-
ture). In case of damage do not use the equipment (the lift) and contact professionally
qualified staff (your dealer).
The packaging materials (plastic bags, expanded polystyrene, nails, screws, pieces of
wood, etc....) must not be left within reach of children since they are potential sources
of danger.
Consign these materials to the specific collection centres if they are pollutant or not
biodegradable.

INSTallaTION arEa

The machine installation requires a usable space of min. 5680 x 7300mm (fig.5).
From the control position the operator has a clear view of the entire lift and the surround-
ing area. The operator must not let any unauthorised person enter this area, and must
ensure that it is clear of potentially hazardous objects.
Do not install on loose or unstable surfaces.
The surface on which the lift is installed must withstand the loads transmitted during
operation.
This surface must have a capacity of at least 25 kg/cm
2
and a resistance class of 250Rck.
The lift contact zones to the floor must be levelled.
68
Operator' s manual

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Erco x4300 ctlt pt6 wi fastErco x4300 ctlt pt2 fastErco x4300 ctltErco x4300 ptErco x4300

Inhaltsverzeichnis