Herunterladen Inhalt Inhalt Diese Seite drucken

Abicor Binzel AUT 61GD Betriebsanleitung Seite 28

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6 Putting into operation
6.3 Mounting the machine side cable assembly
1
11
Cable assembly
1
Coolant return hose
2
Coolant flow hose
3
Re-circulating cooling unit
4
(only with liquid-cooled torches)
Mounting the cable assembly on the machine side
Fig. 3
6.4 Connecting the cooling system
EN - 10
2
10
9
Wire basket spool
5
Shielding gas cylinder
6
Power supply
7
Wire feed unit
8
NOTE
• Check once again whether the wire guide liner has been fastened
correctly.
1 Combine central connector (10) and central socket (8) at the wire feed unit
(8) and secure them with the connecting nut (11).
WARNING
Risk of burns
MAG welding torches will become overheated if the coolant level is too low.
• Wear protective gloves.
• Check the coolant level at regular intervals.
NOTE
• Applies only to liquid-cooled MAG welding torches.
• Make sure that the coolant supply and return have been installed
properly. Coolant supply = blue, Coolant return = red
3
8
Central socket
9
10 Central connector
11 Connection nut
MAG welding torches
4
5
6
7

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Aut 610d

Inhaltsverzeichnis