Herunterladen Inhalt Inhalt Diese Seite drucken

Grundfos Conex DIA-1 Montage- Und Betriebsanleitung Seite 23

Instrument amplifier and controller
Vorschau ausblenden Andere Handbücher für Conex DIA-1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 52
Connecting the sensor interface to the Conex
DIA-1 (see back side of device)
Measuring cells
AQC-D1/-D11/AQC-D2/-D12/AQC-D3/-D13, PAA
(peracetic acid) / HP (peroxide)
Connect terminals 4/1 to 4/14 of the sensor
interface to the corresponding terminals of the
®
Conex
DIA-1.
Measuring cells HP (peroxide) / PAA
(peracetic acid)
In addition, connect terminal A to terminal 1/1
and terminal B to terminal 1/2 of the Conex
DIA-1.
Single-rod measuring chains
(pH, redox)
Connect terminals 3/1 to 3/4 of the sensor
interface to the corresponding terminals of the
®
Conex
DIA-1.
Sample-water deficiency sensor
Connect terminal A to terminal 2/3 and terminal B
to terminal 2/4 of the Conex
When using measuring cell AQC-D2/-D12,
Note
the water sensor must always be
connected and activated!
DIP switch
If necessary, set the DIP switch for the desired
measured value to "On" (move the switch to the
right, top switch 1 is not used).
DIP
On
OFF
1
ClO
, O
2
2
3
4
Cl
2
Fig. 24
DIP switch
®
®
®
DIA-1.
3
23

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis