Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Operation - clage DLX Next Serie Gebrauchs- Und Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
DLX Next

7. Initial operation

EN
STB
Before making the electrical connection, fill the mains and the appliance with water
by carefully opening and closing the hot water tap in order to vent completely.
To ensure a maximum flow, remove any existing aerator from the faucet. Flush the
warm and cold water pipes each at least for one minute.
After every draining (e.g. after work on the plumbing system or following repairs to
the appliance), the heater must be re-vented in this way before starting it up again.
SDB
If the water heater cannot be put into operation, the temperature cut-out or the pres-
sure cut-out may have tripped during transport. If necessary, check that the power
supply is switched off and reset the cut-out.
1. Switch on the power supply to the appliance.
2. Open the hot water tap. Check the function of the appliance. The heating element
will be activated after approx. 10 – 30 sec of continuous water flow.
3. Explain the user how the instantaneous water heater works and hand over the oper-
ating instructions.
4. Fill in the guarantee registration card and send it to the CLAGE Central Customer
Service or use the online registration (see also page 17).
30

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis