Herunterladen Inhalt Inhalt Diese Seite drucken

Installation - Nordpeis N-27 Montageanleitung

Vorschau ausblenden Andere Handbücher für N-27:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 54

Installation

Ensure that the installation is approved by a certified chimney sweep, who can also provide information on which
national and regional regulations apply. Also ensure that a function check of the hatch opening mechanism and
damper control is performed according to the "Function check" section.
Supply of combustion air
Combustion air can be provided directly
via a duct from outside, or indirectly via a
vent in the outer wall of the room where
the stove is to be placed. The amount of
combustion air that is used for combus-
tion is approx. 30 m3/h. Some installation
alternatives are shown to the right.
The air duct connection on the stove has
an external diameter of Ø100 mm. In
hot areas, the duct should be insulated
with 30 mm mineral wool covered with
a moisture inhibitor for example, alumi-
nium tape. It is important that the lead-in
between the pipe and the wall (or floor) is
sealed using jointing compound.
A 1 m length of condensation insulated
ducting for combustion air is available as
an accessory.
22
HK
HK
GB
Alt. 1
Alt. 2
HK
HK

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

N-30

Inhaltsverzeichnis