Herunterladen Inhalt Inhalt Diese Seite drucken

Prior To Installation - Nordpeis Q-27FL Montageanleitung

Vorschau ausblenden Andere Handbücher für Q-27FL:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 50

Prior to installation

Unpacking and removing loose parts
Before moving the insert, the loose parts inside the insert should be removed by removing the screws, which ma-
kes up the transport locking device for the hatch's counter weight. Check that both wires are in the grooves for the
sheaves before the hatch is opened and the loose parts can be removed. Before moving the insert from the pallet,
transport lock the hatch again by reinstalling the screws on the counterweight. The insert is secured to the pallet
via two runners, slacken off the screws and bend the mounting lugs to the side, reinstall the screws on the legs
before removing the insert from the pallet.
Transport locking device
Transportsäkring
Important!
Check wire routing and remove the
transport locking device!
GB
17

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis