Herunterladen Inhalt Inhalt Diese Seite drucken

avidsen V300 Bedienungsanleitung Seite 56

Mit zylinderantrieb; für flügeltore
Vorschau ausblenden Andere Handbücher für V300:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 134
C - INSTALLATION
• Measure distance D, then refer to the table for distance B, which allows you to determine the post
mounting bracket position. The table also indicates the hole in which the actuator will be mounted on the
mounting bracket on the gate.
• The height of the centre of the mounting bracket must be the same as the centre of the gate frame on
which the actuator is mounted.
post
D
Mark the location of the holes in the post, ensuring that the post mounting bracket is mounted horizontally
at the end. Use 10-inch lag screws or any other fastening system suitable for the post material.
Please note: there will be significant force on the mounting bracket when the engine is running. We
recommend sealing threaded rods at least 15 cm in length. If the post is made of metal, we recommend
welding or passing the threaded rods through to secure them with self-locking nuts.
Consult a professional if in doubt.
Turn the actuator over and make sure the carriage rod is about 5mm from the opposite end of the motor.
Otherwise, move the carriage using a 9V LR61 battery. The motors can also be connected to the electronic
card (see connection section) and manual mode can be started in order to power the motors while adjusting
the position of the carriage.
EN
12
B
D (mm) B (mm) post bracket hole
0
150
10
150
20
160
30
150
40
160
50
150
60
155
70
145
80
150
90
135
100
140
110
145
120
130
130
135
140
120
150
115
160
110
170
100
23mm
max angle (°)
4
120°
4
120°
4
120°
4
115°
4 or 5
115°
4
110°
5
110°
4 or 5
105°
5
105°
5
100°
5
100°
5
100°
5
95°
5
95°
5
90°
5
90°
5
90°
5
90°
B

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

114165

Inhaltsverzeichnis