Herunterladen Inhalt Inhalt Diese Seite drucken

Inhaltsverzeichnis; General Information; Guarantee/Safety; Main Statutory Instruments - elco ES08.5200 G/F-VT Betriebsanleitung

Gasgebläsebrenner
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

General information

Contents

Guarantee/safety

Main statutory instruments

Contents
Guarantee, safety............................... 2
Main statutory instruments ................. 2
Overview, key..................................... 3
Packaging........................................... 4
Technical data
See technical data
No. 4200 1017 4200
Assembly............................................ 5
Gas connection .................................. 6
Electrical connection .......................... 6
Settings ..................................... 7 to 13
Programming the control
and safety unit ......................... 14 to 15
TC control panel ............................... 16
Firing ................................................ 17
devices ............................................. 17
Maintenance.................................... 18
Troubleshooting ............................. 19
2
Downloaded from
www.Manualslib.com
Guarantee
Installation and start-up must be carried
out in accordance with correct practice
by a qualified specialist.
Current regulations, as well as the
following instructions, must be complied
with. Any failure, however minor, to
observe these provisions shall absolve
the manufacturer from any liability. Also
see:
- guarantee certificate enclosed with
burner,
- general terms of sale.
Safety
The burner is designed to be installed on
a generator connected to exhaust pipes
used for combustion products in working
conditions.
It should be used in an area where there
is an adequate supply of combustion air
and where polluted products can be
properly evacuated.
Flue size and design must be
appropriate to the fuel, in accordance
with current regulations and standards.
The control and safety unit and cut-off
devices used require a 230 VAC % 50
±1%
Hz
In addition, the neutral conductor
must have the same electrical
potential as the earth conductor.
Should this not be possible, the burner
should be electrically supplied with an
isolating transformer with the necessary
safety devices (fuses and differential
circuit breaker 30 mA).
In order that the burner operates
correctly, please respect the polarity
of the conductors when connecting
the 7P connector.
The burner must be able to be isolated
from the system via an all pole switch
complying with the standards in force.
Operating staff should always act with
extreme caution and especially avoid
direct contact with areas that are not
heat-insulated and electrical circuits.
Avoid splashing water on the electrical
components of the burner.
In the event of flood, fire, fuel leakage or
abnormal operation (strange smells,
noises, etc.), switch off the burner, turn
off the power and fuel supplies and call
in a qualified specialist.
It is essential that all furnaces and
accessories, waste gas ducts and
connection pipes are serviced, cleaned
and swept once a year and before
burner start-up. See the applicable
regulations in force.
05/2009 - Art. Nr. 4200 1017 4400A
manuals search engine
+10
- 15
power supply.
Main statutory instruments "FR"
Residential building:
- French Order dated 2nd August 1977
and later modifying/supplementary
orders: Technical and safety
regulations governing combustible
gas and liquified hydrocarbon
installations located inside dwellings
and their outbuildings.
- DTU Standard P 45-204: Gas
installations (formerly DTU no. 61-1
- Gas installations - April 1982
plus subsequent additions.
- DTU Standard 65.4 Technical
requirements for boiler rooms.
- French NF Standard C15-100 - Low
voltage electrical installation
regulations.
- French Departmental health
regulations.
Public Buildings:
- Public building fire and panic
prevention safety regulations:
General provisions:
- GZ sections (combustible gas and
liquified hydrocarbons);
- CH sections (heating, ventilation,
cooling, air conditioning and steam
and domestic hot water production);
Provisions specific to each type of public
building.
Outside "FR"
Conform to the local regulations and
practices.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis