Page EN-14
Materials required for assembly
Materials required for assembly
Parts list
(1) Exhaust hood
(2) Upper section of the flue screen
(3) Lower section of the flue screen
(4) Exhaust air operation: Exhaust air hose
(5) Check valve
(6) Wall mount for upper flue screen
(7) Retaining plate for lower flue screen
(8) 4 plate screws 4.0 × 8 mm
(9) Cable ties
Screws
The screws and dowels required to mount
the appliance on a wall are not included in
the package contents, as their type and di-
mensions will vary depending on the charac-
(1)
teristics of the wall. Please have a specialist
advise you as to which ones you need.
(2)
(3)
(4)
(5)
(6)
In total, you will need
– 2 round-head screws (10) to attach the wall
(7)
mount (6) for the upper flue screen
– 2 round-head screws (11) to mount the
Exhaust hood, maximum ø 6 mm
(8)
– 2 round-head screws (12) with flat washers
to secure the Exhaust hood,
(9)
maximum ø 6 mm
– 6 suitable dowels
Tools and aids
You will need:
– screwdriver
– drill with stone bit, correctly sized for the
screws (10), (11) and (12).
– measuring tape / ruler
– spirit level and pencil
– stable stepladder
– work gloves
– another person to help
(10)
(11)
(12)