Herunterladen Inhalt Inhalt Diese Seite drucken

Villeroy & Boch ProDetect 2 Installationsanleitung Seite 62

Vorschau ausblenden Andere Handbücher für ProDetect 2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation
1. Mount siphon, if necessary connect to mains power supply (only for mains model).
2. Attach clamping bracket to the power supply unit and snap the controller onto the power supply unit.
3. Route solenoid valve cable, sensor cable and controller incl. power supply/battery compartment downwards
through the inspection hole. If the Bluetooth adapter is used route the connection cable also downwards
through the inspection hole.
For mains model: Connect to 220V mains,
power supply unit down through the inspection opening.
4. Attach urinal to the wall. Connect urinal flushing system,
5. Push cable carefully upwards into the urinal.
We recommend that the cable outlets of the housing (which is to be pushed in) face forwards.
6. Push the complete housing unit through the inspection opening and attach to the siphon tube using the
clamping bracket.
Ensure that the cables are no longer visible.
7. Before opening the connected water line, you must ensure that the urinal control system has previously been
commissioned for a minimum of 30 seconds (power connection). This applies to the battery and mains
versions.
S. 62
see "Connecting to the mains power supply", page
Important
If no Bluetooth adapter is mounted:
if necessary, adjust the settings on the controller, see separate operating instructions
before mounting the urinal flushing system.
see "Connection diagram", page
57. Route
56.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis