INSTALLATION
Preparation
Step 1
Take all parts out.
Handle with care and don't leave any parts.
Install struts
Step 2
Put the underpan away and take both struts out. Make the data transmission line trough right side
strut. Then fasten the screws on the bottom stand pillar with tools. Also, tighten the other side strut as
the same way.
47