1.

INDOOR UNIT INSTALLATION

1.1

Installation place

The indoor unit should be installed in a location that meets the
following requirements:
- There is enough room for installation and maintenance.
The ceiling is horizontal, and its structure can endure the weight
-
of the indoor unit.
-
The outlet and the inlet are not impeded, and the influence of
external air is the least.
-
The air flow can reach throughout the room.
-
The connecting pipe and drainpipe could be extracted out easily.
-
There is no direct radiation from heaters.
Maintenance roomage
200mm
CAUTION
Keep indoor unit, outdoor unit, power supply wiring and
transmission wiring at least 1 meter away from televisions
and radios. This is to prevent image interference and noise
in those electrical appliances. (Noise may be generated
depending on the conditions under which the electric wave
is generated, even if 1 meter is kept.)
NOTE
All the pictures in this manual are for explanation purpose only.
There may be slightly different from the air conditioner you
purchased ( depend on model ). The actual shape shall prevail.
300mm
600mmX600mm
checking orifice
59
1.2 Install the main body
1
Installing
10 hanging screw bolts. (4 bolts)
O
Please refer to the following figures for positioning 4 screw bolts.
Evaluate the ceiling construction and please install with
hanging screw bolts.
Consult the construction personnel for the specific procedures.
- Do keep the ceiling flat. Consolidate the roof beam to avoid
possible vibration.
Carry out the pipe and line operation in the ceiling after finishing
the installation of the main body. While choosing where to start
the operation, determine the direction of the pipes to be drawn
out. Especially in case there is a ceiling, position the refrigerant
pipes, drain pipes,indoor & outdoor lines to the connection
places before hanging up the machine.
The installation of hanging screw bolts.
- Cut off the roof beam.
- Streng then the place that has been cut off, and consolidate the
roof beam.
After the selection of installation location, position the refrigerant
pipes, drain pipes,indoor & outdoor wires to the connection
places before hanging up the machine.
The installation of hanging screw bolts.
NOTE
Confirm the minimum drain tilt is 1/100 or more
1.2.1 Wooden construction
Put the square timber crosswise over the roo fbeam, then install the hanging
screw bolts.
Timber over the beam
1.2.2 New concrete bricks
Inlaying or embedding the screw bolts.
(Blade shape insertion)
1.2.3 For Original concrete bricks
Use embedding screw bold, crock and stick harness.
Embedding screw bolt
(Pipe hanging and embedding screw bolt)
O
10
Roof beam
Ceiling
Hanging screw bolts
(Slide insertion)
Steel bar