Herunterladen Inhalt Inhalt Diese Seite drucken

Installation And Connection Of The Unit - Medion md 2867 Handbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
I
NSTALLATION AND CONNECTION OF THE UNIT
Before you connect the unit to the mains supply,
check the type of current and voltage at the
installation location with respect to the information
given on the manufacturer's nameplate.
After transport, leave the unit for 3 hours in an
upright position before connecting it.
The manufacturer is not responsible for
any incorrect installation or operating
errors. You will be charged for any
servicing costs resulting from such errors,
even during the warranty period.
GB
GB-9

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis