Herunterladen Diese Seite drucken

THERMEx Integrata Montageanleitung Seite 37

Vorschau ausblenden Andere Handbücher für Integrata:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 42
Ventilator CKB 800 - 1200 - 2000 - for ceiling installation
NB! Electrical installations must be performed by a qualified electrician.
Installation (1)
The ventilator is attached to a flat surface with the help of 4 screws.
Connection plate (2)
Remove the 3/4 screws holding the motor and then connect and fix the suction flange to the
motor using the removed 3/4 screws.
Installing the duct connection (3)
The duct connection (Ø 160 mm) (3) leading off the canopy is connected to the suction flange.
The duct connection is then fixed to the suction flange (Ø 160/200 mm) (4) and connected to
a roof cowl or wall flange.
Connecting the power (5)
Connect the power cable labelled »motor« from the canopy to an extension cable connected
to a plug connector from the external motor.
Technical data:
Type
Voltage (V)
Watt consumption
Regulation option
Extraction in m
3
/h at 0 vs
Speed in revs per min.
Noise level (dB)
Weight in kg
Ducting sizes:
Suction
Exhaust
CKB 800
230
175
Incorporated
800
1300
60
8
Ø160 mm
Ø160 mm
CKB 1200
230
300
Incorporated
1200
1300
60
12
Ø160 mm
Ø160 mm
English
CKB 2000
230
600
Incorporated
2000
1300
65
16
Ø160 mm
Ø200 mm
37

Werbung

loading