Herunterladen Diese Seite drucken

De Dietrich DTG 220 Eco.NOx/II Bedienungsanleitung Seite 16

Vorschau ausblenden Andere Handbücher für DTG 220 Eco.NOx/II:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 7
4 Setting the start up pressure
Right valve
1/4 turn
If necessary, the start-up pressure can be set on the right valve (1st
stage) using a flat screwdriver.
In the factory, it is set to (minimum).
To modify this setting, it necessary first to remove the protection
using a screwdriver (1/4 turn).
Start-up
pressure
Natural gas H/E
Natural gas L/LL
Left valve
The progressivity of the left valve (2nd stage) is always set to
"Minimum" (6-13 sections).
No setting is needed on the left valve on a 14-element boiler.
31/07/07 - 94858457 - 8502-4459B
Recommended position
5 mbar
min.
Adaptation à un autre gaz - Gaz naturel
Operation of the progressivity screw setting
Pressure (mbar)
Time (s)
16

Werbung

loading

Diese Anleitung auch für:

Gsr 230 n/iiDtg 230 eco.nox