Herunterladen Diese Seite drucken

De Dietrich DTG 220 Eco.NOx/II Bedienungsanleitung Seite 15

Vorschau ausblenden Andere Handbücher für DTG 220 Eco.NOx/II:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 7
3 Setting the injector pressure
Turn the boiler on.
See: Boiler installation and maintenance instructions
Final checks before commissioning
Commissioning procedure
The pressure must be set by a qualified professional.
Pressure socket
- Connect the manometer to the left or right pressure outlet on the
manifold.
- Set the boiler thermostats to maximum.
- Unscrew the protection cap on each valve.
- Set the pressure on the left valve and the right valve using the
screw which can be found under the protective plug.
7 Pressions de réglage et marquages des injecteurs calibrés
(page: 18)
The pressure must be the same on both pressure outlets on
the manifold.
- Replace the protection caps.
31/07/07 - 94858457 - 8502-4459B
Adaptation à un autre gaz - Gaz naturel
15

Werbung

loading

Diese Anleitung auch für:

Gsr 230 n/iiDtg 230 eco.nox