Herunterladen Inhalt Inhalt Diese Seite drucken

Simons Voss Technologies WaveNet LockNode Kurzanleitung Seite 29

Vorschau ausblenden Andere Handbücher für WaveNet LockNode:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
6. Signalling
from locking cylinders or SmartHandles or approx. 40
cm from SmartRelays.
IMPORTANT
Connection with SREL.ADV
You can also connect the LockNode with
WN.KAB.WIRED-BF directly to the SREL.ADV (no
minimum distance required)
4. If necessary, connect the WN.LN.SENSOR.CABLE.
5. If necessary, connect the WN.LN.SENSOR.CABLE to the
devices to be connected.
6. Connect the power supply or insert the batteries.
LockNode is installed.
9
6. Signalling
Normal operation
LED
flashes red twice
flashes red/green
Meaning
Initialization is complete.
Data is transferred.
29 / 116 | EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis