Herunterladen Diese Seite drucken

FAAC 275 H600 Bedienungsanleitung Seite 55

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 86
STANDARD PROCEDURE FOR A 6-MONTHLY ORDINARY MAINTENANCE OF
CONCEILING TRAFFIC BOLLARD FAAC CITY 275 H600 and 275 H800:
Ordinary maintenance standard procedure:
Clean the pit and remove any settled material by suction
Clean the water drainage systems on the pit bottom
Clean and lubricate the central sliding guide
Check (and replace, if necessary) the bottom limit-stop gaskets
Check (and repair, if necessary) any oil leakages from the driving piston
Check the correct tightening of the bollard screws
Clean the driven cylinder and touch up paint, if necessary
Check the hydraulic unit and top up oil, if necessary. Check the setting of the operating
pressure
Check and set, if necessary, the functions of the safety pressure switch (40 Kg.)
THE FOLLOWING CHECKS ARE ALSO TO BE PERFORMED:
Check the operation of the flashing lamp incorporated in the bollard head
Check the operation of the safety inductive loops
Check the operation of the command radio receiver
Visual check of the control unit
FAAC S.p.A. Via Benini, 1 40069 Zola Predosa Bologna (Italia) tel. +39 051 61724
- 26 -
www.faac.it

Werbung

loading

Diese Anleitung auch für:

275 h800