Herunterladen Inhalt Inhalt Diese Seite drucken

Vacuuming And Charging - Acson international C Serie Installationshandbuch

Inverter ceiling concealed split type air conditioner
Vorschau ausblenden Andere Handbücher für C Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 47
Vacuuming is necessary to eliminate all moisture and air from the system. The series II Outdoor Unit is provided with fl are
valve fi ttings.
Vacuuming The Piping And The Indoor Unit
Except for the outdoor unit which is pre-charged with
refrigerant, the indoor unit and the refrigerant connection
pipes must be air-purged because the air containing moisture
that remains in the refrigerant cycle may cause malfunction
of the compressor.
• Remove the caps from the valve and the service port.
• Connect the center of the charging gauge to the vacuum
pump.
• Connect the charging gauge to the service port of the 3-way
valve.
• Start the vacuum pump. Evacuate for approximately 30
minutes. The evacuation time varies with different vacuum
pump capacity. Confi rm that the charging gauge needle has
moved towards -760mmHg.
Caution
• If the gauge needle does not move to -760mmHg, be sure to
check for gas leaks (using the refrigerant detector) at fl are
type connection of the indoor and outdoor unit and repair
the leak before proceeding to the next step.
• Close the valve of the changing gauge and stop the vacuum
pump.
• On the outdoor unit, open the suction valve (3 way) and
liquid valve (2 way) (in anti-clockwise direction) with 4mm
key for hexagon sacked screw.
Charge Operation
This operation must be done by using a gas cylinder and a
precise weighing machine. The additional charge is topped-up
into the outdoor unit using the suction valve via the service
port.
• Remove the service port cap.
• Connect the low pressure side of the charging gauge to the
suction service port center of the cylinder tank and close
the high pressure side of the gauge. Purge the air from the
service hose.
• Start the air conditioner unit.
• Open the gas cylinder and low pressure charging valve.
• When the required refrigerant quantity is pumped into
the unit, close the low pressure side and the gas cylinder
valve.
• Disconnect the service hose from service port. Put back the
service port cap.

VACUUMING AND CHARGING

1-17
Refrigerant Piping
Allen key
Flare nut
Service Port
Outdoor Unit 3 ways valve
LOW PRESSURE GAUGE
HIGH PRESSURE GAUGE
-760mmHg
GAUGE MANIFOLD
HANDLE LO
HANDLE HI (ALWAYS CLOSED)
CHARGE HOSE
CHARGE HOSE
LIQUID VALVE
GAS VALVE
(3-WAY)
CONFIGURATION OF AIR
PURGE BY CHARGING
HIGH PRESSURE GAUGE
LOW PRESSURE GAUGE
-760mmHg
GAUGE MANIFOLD
HANDLE HI (ALWAYS CLOSED)
HANDLE LO
CHARGE HOSE
CHARGE HOSE
LIQUID VALVE
GAS VALVE
(3-WAY)
VACUUM PUMP
ADAPTER FOR
COUNTER FLOW
PREVENTION
CHECK VALVE
CHECK VALVE
CONFIGURATION OF AIR
PURGE BY CHARGING

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis