Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 55

BEFoRE oPERaTIoN


Handling unit (centre of gravity)
When the unit is lifted, pay attention to the following points:
1 Do not remove the wooden base until its final position.
2 To prevent the unit from overturning, pay attention to the centre of gravity as shown in the following figure:
RASC-(4-6)HNPE
3 Due to the high weight of these units, use the appropriate machinery for these works.
5 BEFORE OPERATION
!
C A U T I O N
Supply electrical power to the system for approximately 12 hours
before start-up or a long shutdown. Do not start the system
immediately after power supply, it may cause a compressor failure
because the compressor is not heated well.
When the system is started after a shutdown longer that approximately
3 months, it is recommended to check the system by your service
contractor.
4
PMML0399B rev.1 - 07/2016
Model
Gross weight (kg)
RASC-4HNPE
218
RASC-5HNPE
218
RASC-6HNPE
218
RASC-8HNPE
333
RASC-10HNPE
336
Turn OFF the main switch when the system is to be stopped for a long
period of time: If the main switch is not turned OFF, electricity will be
used, because the oil heater is always energised during compressor
stopping.
Make sure that the RASC unit is not covered with snow or ice. If
covered, remove it by using hot water (approximately 50°C). If the
water temperature is higher that 50°C, it will cause damage to plastic
parts.
RASC-(8/10)HNPE
(mm)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis