Herunterladen Inhalt Inhalt Diese Seite drucken

Eaton POWERWARE 5125 Schnelle Inbetriebnahme Seite 2

Für ibm-anwendungen
Vorschau ausblenden Andere Handbücher für POWERWARE 5125:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 9
3.
Secure both rails to the back of the rack with
pan-head screws. Insert the screws through the clip
nuts installed in Step 2.
4.
Secure both rails to the front of the rack with
pan-head screws. Insert the screws through the
center holes of the rail.
NOTE Do not tighten the screws until the UPS or EBM is
installed.
5.
Slide the UPS and any optional EBMs into the rack.
The UPS and EBM are heavy. A minimum of two people are
required to lift the UPS into the rack.
6.
To secure the back of the UPS to the rack, loosen the
wing nut on the rear hold-down bracket and slide the
bracket over the rear of the UPS. Tighten the wing
nut.
7.
Secure the front of the UPS to the rack using
flat-head screws.
2
C A U T I O N
Powerware
5125 (9910 P18) Quick Start for IBM
®
Rear Hold-Down
Bracket
Applications : 164201421 A
®

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis