Herunterladen Inhalt Inhalt Diese Seite drucken

CAME BX Serie Installationsanleitung Seite 29

Antrieb für schiebetore
Vorschau ausblenden Andere Handbücher für BX Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 74
5.5 Securing the plate and installing the assembly
The following applications are only examples, as the space for installing the ratiomotor and accessories varies according to
obstructions. It is thus up to the system installer to select the most suitable solution.
- Dig a pit to the side of the gate (see measurements from diagram).
Prepare the corrugated tubes you will need when making connections coming from the shunt pit.
N.B. the number of tubes depends on the type of system and the accessories you will hook up.
- Prepare a form box that is larger in size than the securing plate and insert it into the pit. The form box should jut 50mm above ground
level.
Insert an iron grid inside the from box to reinforce the concrete.
- Prepare the securing plate, insert the bolts into the holes and lock them using the supplied nuts and washers. Extract the preformed
brackets using a screw driver or a set of pliers.
- Position the plate on top of the grid. Careful! The tubes need to pass through the apposite holes.
Conduits for electric
cables
Shunt pit

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bx-246

Inhaltsverzeichnis