Width,
mm
545

3.3 Preparation of facility .

Requirements for installation:
the facility must be clean, dust-free, dry and protected against atmospheric conditions;
the floor of the facility must be flat and level and sustain the weight of the machine;
the machine is portable and doesn't require fastening to the floor;
free access to all maintenance doors and areas should be ensured.

3.4 Connection to compressed-air line.

All work associated with connecting compressor equipment must be carried out with the
pneumatic system not under pressure.
Connecting to the compressed air line should only be carried out by a qualified specialist. The
required air compressor capacity is determined by the blast nozzle size and pressure.
Ø of blast nozzle, mm
5,0
6,5
8,0
NOTE: the above table shows only the air required for the blast nozzle. Additional air is required
for the air cartridge cleaning, which must be added to the above values. The above values are
valid for nozzles when new. As nozzle wear increases, so does the air consumption, up to 70% to
80% more than when new.
CONTRACOR® BRS series. Dust-free abrasive blast cleaning machine
Dimensions of BRS-3/5 machine
Length,
mm
1795
Placing the machine in unsuitable environments can diminish its
performance as a result of overloading. Such cases provide no
guaranteed performance.
REQUIRED FLOW RATE OF COMPRESSED AIR, m3/min
3,0
0,7
1,3
2,0
Height,
mm
1820
at working pressure, bar
4,0
0,8
1,5
2,5
Mass,
kg
650/690
5,0
6,0
0,9
1,0
1,7
1,9
2,0
3,3
13