Herunterladen Inhalt Inhalt Diese Seite drucken

Installation - Hama EWS-870 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für EWS-870:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 9
• Do not mix old and new batteries or batteries of
a different type or make.
• When inserting batteries, note the correct
polarity (+ and - markings) and insert
the batteries accordingly. Failure to do so could
result in the batteries leaking or exploding.
• Do not charge batteries.
• Keep batteries out of the reach of children.
• Do not short circuit the batteries/rechargeable
batteries and keep them away from uncoated
metal objects.
4. Getting Started
4.1. Measuring station
• Open the battery compartment (22) and insert two
AA batteries with the correct polarity.
• Move the CH slide switch (21) to the left or right
to select the channel on which the measuring
station transmits.
• Once the channel is assigned to one transmitter,
you can only change it by removing the batteries
or resetting the unit.
• Close the battery compartment.
Note
Before use, ensure you insert the batteries in
the measuring station first and then in the base
station.
4.2. Base station
• Remove the screen protector from the display.
• Open the battery compartment (17) and insert two
AA batteries with the correct polarity.

5. Installation

Note – Installation
• We recommend initially placing the base and
measuring stations in the intended locations
without installing them and making all the
settings described in
6. Operation
– to do.
• Only install the stations once the appropriate
settings have been made and a stable wireless
connection is established.
Note
• The wireless transmission range between the
measuring
and base stations is up to 50 m in open spaces.
• Before installation, ensure that wireless
transmission will not be disrupted by
interference or obstacles like buildings, trees,
vehicles, high-voltage lines, etc.
• Before the final installation, ensure that there
is sufficient reception between the intended
installation locations.
• When installing the measuring station, ensure
that it is protected from
direct sunlight and rain.
• The international standard height for measuring
air temperature
is 1.25 m (4 ft) above ground.
Warning
• Buy special or suitable installation material from
a specialised dealer for wall-mounting.
• Ensure that no faulty or damaged parts are
installed.
• Never apply force during installation. This could
damage the product.
• Before installation, ensure that the chosen wall
is suitable for the weight to be mounted, and
make sure that there are no electrical wires,
water, gas or other lines at the installation site
on the wall.
5.1. Base station
• Use the base to position the base station on a
level surface.
5.2. Measuring station
• You can also position the measuring station on a
level outdoor surface.
• We recommend installing the measuring station
securely on an outdoor wall
using the opening (19).
• Install an anchor, screw, nail, etc. in the wall of
your choice.
• Hang the measuring station using the opening
intended for this purpose (19).
3

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis