Herunterladen Inhalt Inhalt Diese Seite drucken

Step 5.1 Installing The Steering Tube - Babboe Curve Montageanleitung

Vorschau ausblenden Andere Handbücher für Curve:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Step 5.1
INSTALLING THE STEERING TUBE
PARTS
• Sachet B (2x M8 bolts, 2x M8 lock washers,
4x M8 washers)
This step involves mounting the steering tube onto the front frame. The steering tube is
already connected to the rear frame by means of the gear and brake cable.
10
E
1.
Position the steering tube against the front frame as shown in figure 10.
2.
Insert the two M8 bolts into the attachment holes and firmly tighten the nuts on the
underside. If this does not go smoothly, gently tap the bolt through the hole with a
hammer or the handle of a screw driver.
Please note
Adhere to the specified order for nuts, bolts and washers to ensure optimal assembly.
See detail E for the correct order.
54
TOOLS
• Spanner # 13
• Allen key # 5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis