Herunterladen Inhalt Inhalt Diese Seite drucken

Nibe PKM 20 Montageanweisung Seite 14

Vorschau ausblenden Andere Handbücher für PKM 20:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

GB
12
The pipe installation is to be carried out according to
the diagram below. The enclosed T-joint is mounted
as shown in the picture under "Component positions"
at positions (A) and (B). The installation should be
done so that vibrations are not transferred from the
heat pump to the cooling module via the pipes and
onward.
SÄV
NK
AV
KB-in
KB-ut
AV
Shutoff valve
BK/JK
Rock collector/Soil collector
EXP
Expansion vessel
FG
Flow sensor
KB-in
Brine in
KB-out
Brine out
NK
Level vessel
SV-K
Shunt valve
SÄV
Safety valve
VXV-K
Shuttle valve
VVB/ACK Accumulator with
hot water heater
Pipe installation, outline diagram
VVB/ACK
FIGHTER 1220
E
C
FG
I
VXV-K
G
H
AV
PKM
SÄV
A
EXP
B
PKM
SV-K
F
BK/JK

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pkm 10

Inhaltsverzeichnis