Herunterladen Inhalt Inhalt Diese Seite drucken

dB Technologies VIO-L212 Bedienungsanleitung Seite 48

Active 3-way line array module
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 57
English
Move the dolly with the rest of the 4 modules below the ones already lifted. Remove the belt and the top from
the second dolly.
Rig one module at a time and slightly lift/lower the ropes with the motors, initially with front installation and
then with rear one, as shown in the MECHANICS AND MAIN EQUIPMENT section.
Connect the modules with each other as the installation proceeds.
End the composition and the line-array connections.
!
WARNING
The product and accessories must be handled by experienced personnel only! Make sure that the installation
is positioned in a stable and safe manner in order to avoid hazardous conditions for people, animals and/or
objects. The user is required to follow regulations and mandatory laws on safety of the country in which the
product is used. For safe use, regularly check the operation of all parts and integrity before use.
Design, calculations, installation, testing and maintenance of suspended systems or professional audio stacks
must be performed by authorized personnel only. AEB Industriale is not responsible for improper installations,
non-compliant with safety requirements.
VIO-L212
A
B
Code 420120270 REV. 1.0
47

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis