Herunterladen Inhalt Inhalt Diese Seite drucken

Place Of Installation - ATH-Heinl ATH Comfort Lift 2.30 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Max. inclination
Concrete drying time:
If soils do not comply with the requirements, there could evoke serious injuries to personal or damages to the
lift.
Do not install the lift on asphalt, soft concrete floor-
There must be no expansion joints or cuts, which will break the continuity of the upper reinforcement.
Load-capacity of false ceilings must be checked by operator.

Place of installation

Distance main
B1
Distance post -
L1
H
Celling weight
Permitted operating temperatures:
Maximum permitted humidity:
Low height above the sea level:
Power connection and ground cable (see technical data) it could be in form of plug connector (socket and plug device) or
fixed connection.
Necessary supply lines
® Urheberrecht ATH-Heinl GmbH & Co. KG, 2017, Alle Rechte vorbehalten. / Druckfehler und technische Änderungen vorbehalten / Stand: 07/2017
Min. 1.000mm
post-wall
Min. 3200mm
wall
Check the
technical data
13mm
Min. 20 Days
Distance opposite
B2
L2
10-50 °C
≤80% By 30 °C
≤2000m
See technical data
19
Min. 700 mm
post- wall
Distance post -
Min. 3200mm
wall

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis