4. Installation

4
Installation
<Preparation before the installation and service>
● Prepare the proper tools.
● Prepare the proper protection.
● Allow parts to cool before attempting any maintenance.
● Provide adequate ventilation.
● After stopping the operation of the system, turn off the power-supply breaker and remove the power plug.
● Discharge the capacitor before commencing work involving the electric parts.
<Precautions during service>
● Do not perform work involving electric parts with wet hands.
● Do not pour water or liquid into the electric parts.
● Do not touch the refrigerant.
● Do not touch the hot or cold surfaces in the refrigerant cycle.
● When the repair or the inspection of the circuit needs to be done without turning off the power, exercise great caution not to touch any live parts.

4.1 Location

Transportation and Handling

<Figure 4.1.1>
Hydrobox is delivered on a wooden pallet base with cardboard protection.
Care should be taken when transporting the hydrobox so that the casing is not
damaged by impact. Do not remove the protective packaging until hydrobox has
reached its final location. This will help protect the structure and control panel.
Note:
• The hydrobox should ALWAYS be moved by a minimum of 2 people.
• Do NOT hold piping when moving the hydrobox.

Suitable Location

Before installation the hydrobox should be stored in a frost-free weatherproof
location. Units must NOT be stacked.
• The hydrobox should be installed indoors in a frost free weather proof location.
• The hydrobox should be positioned on a level wall capable of supporting it's
filled weight.
• To find out the weight, refer to "3. Technical Information".
• Care should be taken that minimum distances around and in front of the unit for
service access are observed <Figure 4.1.3>.
• Secure the hydrobox to prevent it being knocked over accidentally or during
earthquakes.
• The hook and panel supports should be used to fix the hydrobox to the wall.
<Fig. 4.1.2>
• Install the hydrobox where it is not exposed to water/excessive moisture.
5
Hook
Panel
support
<Figure 4.1.2>

Service access diagrams

Service access
Parameter
a
b
c
d
<Table 4.1.1>
Sufficient space MUST be left for the provision of discharge pipework as detailed
in National and Local building regulations.
a
b
c
<Figure 4.1.3>
Service access
The hydrobox must be located indoors and in a frost-free environment, for
example in a utility room.

Room Thermostat

If fitting a new room thermostat for this system;
• Position it out of direct sunlight and draughts
• Position it away from internal heat sources
• Position it in a room without a TRV on the radiator/heat emittor
• Position it on an internal wall
Note: Do not position the thermostat excessively close to the wall. The thermostat
may detect the temperature of the wall, which could affect appropriate
control of the room temperature.
• Position it approx. 1.5 m above floor level

Repositioning hydrobox

If you need to move the hydrobox to a new position FULLY DRAIN it before mov-
ing to avoid damage to the unit.
Note: Do NOT hold piping when moving the hydrobox.
Dimension (mm)
200
150
500
500
b
d