Herunterladen Inhalt Inhalt Diese Seite drucken

Control Panel - Zanussi ZFT11101WA Benutzerinformation

Vorschau ausblenden Andere Handbücher für ZFT11101WA:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Installation
Important! For electrical connection carefully
follow the instructions given in specific
paragraphs.
• Unpack the appliance and check if there are
damages on it. Do not connect the appli-
ance if it is damaged. Report possible dam-
ages immediately to the place you bought it.
In that case retain packing.
• It is advisable to wait at least four hours be-
fore connecting the appliance to allow the
oil to flow back in the compressor.
• Adequate air circulation should be around
the appliance, lacking this leads to over-
heating. To achieve sufficient ventilation fol-
low the instructions relevant to installation.
• Wherever possible the back of the product
should be against a wall to avoid touching
or catching warm parts (compressor, con-
denser) to prevent possible burn.
• The appliance must not be located close to
radiators or cookers.
• Make sure that the mains plug is accessible
after the installation of the appliance.

Control panel

Green Indicator Light
1
Red Indicator Light
2
Temperature Regulator
3
Half Loaded position
4
Full Loaded position
5
Switching on
1. Allow the appliance to stand for 4 hours
after installation.
16
2
1
• Connect to potable water supply only (If a
water connection is foreseen).
Service
• Any electrical work required to do the serv-
icing of the appliance should be carried out
by a qualified electrician or competent per-
son.
• This product must be serviced by an author-
ized Service Centre, and only genuine spare
parts must be used.
Environment Protection
This appliance does not contain gasses
which could damage the ozone layer, in
either its refrigerant circuit or insulation materi-
als. The appliance shall not be discarded to-
gether with the urban refuse and rubbish. The
insulation foam contains flammable gases: the
appliance shall be disposed according to the
applicable regulations to obtain from your local
authorities. Avoid damaging the cooling unit,
especially at the rear near the heat exchanger.
The materials used on this appliance marked
by the symbol
are recyclable.
2. Insert the plug into the wall socket.
3. Turn the Temperature Regulator clockwise
to the Full Loaded position.
4. The Green Indicator Light will light up and
remain lit until the appliance is switched
off at the mains.
5. Leave to run for 4 hours to allow the cor-
rect temperature to be reached before
placing food inside.
3
4
5
0
www.zanussi.com

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis