Herunterladen Diese Seite drucken

Eibenstock PLD 160 Originalbetriebsanleitung Seite 24

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Manual Drilling
wet drilling
dry drilling
Rig drilling
wet drilling
Manual Drilling
Dry drilling
Mount the appropriate adapter for dedusting. (refer to illustration at p. 23)
Fix the required dry drill bit on the working spindle. Check for appropriate
gear selection. Operate the ON/OFF switch and drill until the segments are
approximately 5 mm in the material. Remove the centering point. Refix the
drill bit to the existing groove and complete your drilling.
Wet drilling
For wet drilling, we recommend the use of a centering device with
water collection (order No. 35847).
This water collection is a must for overhead-drilling.
Open the ball valve and switch the tool on.
Hold the tool tight with both hands. Locate the tool slightly inclined. Once
the drill bit is in the material (approx. 1/8 to 1/4 of the circumference), bring
the tool into an angle of 90 degrees and continue drilling.
Diameter (mm)
42 – 72
12 – 42
122 – 202
62 – 112
12 – 62
82 – 162
42 – 72
12 – 42
Insert the centering point so that the recesses in the
centering point latch on the catches of the working
spindle.
Insert the gas spring with the water collecting ring
and the guide ring appropriate for the drill bit
diameter into the tension disk. Shift the gas spring up
to complete coverage of the bit segments by the
water collecting ring. Tighten the wing screw.
On drilling overhead, make sure that the water
supply is opened only after having switch the water
remover on and the removing unit was fixed to the
wall or ceiling.
23
Gear
2
3
1
2
3
1
2
3

Werbung

loading