Herunterladen Diese Seite drucken

Eibenstock PLD 160 Originalbetriebsanleitung Seite 23

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Water Supply
The connector for the tool should be a GARDENA hose connector.
You can obtain it from your local dealer. Use only pure tap water.
If water comes out of the drainage hole at the gear neck, stop your work
and have the tool repaired by an authorised service shop.
Dust Exhaustion
Changing Gears
1st gear
-1
600 min
2nd gear
-1
1400 min
3rd gear
-1
3000 min
Warning!
- Never apply force, and change the gear only when the tool is
!
running down.
- Never use tools, such as hammers or pliers to change the gear.
Place the adapter with the ball valve onto the tool's
connector and turn into the direction of the arrow up to
the stop. Connect the tool to the water supply system or
a water pressure vessel using the push fit nipple.
Attention! The maximum water pressure should not
exceed 6 bars. In case of higher water pressure, a
pressure relieve valve must be used.
Dust which occurs during your work is hazardous to health.
That is why it is advisable to use a deduster and to wear a
dust mask on dry drilling. Place the adapter for the dedusting
unit onto the tool's connector and turn into the direction of the
arrow up to the stop. As a suitable wet/dry deduster, our
DSS 25 A is available as add-on. The use of a dedusting
system is also a prerequisite for optimal cutting performance
of the bit (air cooling).
The PLD 160 is equipped with a 3-gear oil-
bath gearing. Select the speed according to
the drilling diameter.
Use the gear selector to change to next higher
or lower gear.
If gear changing is too heavy, slightly turn the
working spindle to ease gear changing.
Switching the tool on and off for a moment
may also help to ease gear selection.
22

Werbung

loading