Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance / Checks; Cleaning / Care - Novoferm N-423 Montageanleitung

Vorschau ausblenden Andere Handbücher für N-423:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Maintenance / Checks

Maintenance / Checks
For your safety, we recommend that the door system be checked before initial use and as needed -
but at least once a month - by a specialist. We recommend consulting a specialist company.
Monitoring the force limit
The operator control unit features a 2-processor safety system to monitor the force limit. In an end position or
after restarting, the integrated power disconnection is tested automatically. Prior to commissioning and once
a month, the door system must be checked. The examination of the force limiting device must be carried out
according!
Caution:
Closing force set too high can lead to personal injury.
The force for the OPEN drive can be adjusted in menu step 5 and the force for the CLOSE drive in step 6.

Cleaning / Care

Always pull the mains plug before working on the door or on the drive! If necessary, wipe the drive
with a dry cloth.
56
N-423

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis