5.4 Torque Specifications

Figure 5.2 Overview of inverter with torque indications
Parameters
A
M63 cable gland
Swivel nut for M63 cable gland
B
AC terminals
C
Primary grounding conductor
(secondary grounding conductor
directly to the right of it)
D
PV terminals
E
M32 cable gland
Swivel nut for M32 cable gland
F
M25 cable gland
Swivel nut for M25 cable gland
G
M6 equipment grounding
(equipotential bonding terminal)
Front screw (not shown)
Table 5.7: Torques
Installation Guide
Tools
Wrench 65/68 mm
Wrench 65/68 mm
HX 8
TX 30
HX 8
Wrench 42 mm
Wrench 42 mm
Wrench 33 mm
Wrench 33 mm
TX 20
TX 30
5  Technical Data
Torque
6 Nm
3 Nm
20 Nm (cable sheath diameter =
35 to 95 mm);
30 Nm (cable sheath diameter =
96 to 150 mm);
3.9 Nm
20 Nm (cable sheath diameter =
35 to 95 mm);
30 Nm (cable sheath diameter =
96 to 150 mm);
6 Nm
1.8 Nm
4 Nm
1.8 Nm
3.9 Nm
1.5 Nm
SHP75-10-IA-xx-10