Herunterladen Inhalt Inhalt Diese Seite drucken

Operation - EINHELL BT-BD 701 Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für BT-BD 701:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
fasten with the grub screw (20).
You can now fit the table and clamp in place
with the clamping lever. Following this, fit the
crank (27) and fasten tightly with the screw
(28).
Finally, fit the complete bit head to the pillar.
Align the head so that it is horizontal to the
base plate and fasten it in position with the
screws (33).
Screw the 3 supplied handles (9) in the hand-
le mounts.
Before you mount the drill chuck with the
MK shank, check that both parts are clean.
Insert the taper mandrel in the taper of the
drill chuck with a powerful jolt. Then insert the
taper in the spindle (Fig. 12)
Check the tension of the V-belt regularly befo-
re use (Fig. 8).
Important: All bare parts are greased in order to
protect them from corrosion. Before mounting the
drill chuck (10) onto the spindle (11), both parts
must be completely degreased using an environ-
mentally friendly solvent. This ensures optimal
transmission of power.
5.2. Installing the machine (Figs. 3/4)
Before you use the drill for the fi rst time it must be
mounted in a stationary position on a fi rm surface.
Use both mounting holes (12) in the base plate to
do this. Ensure that the machine is freely acces-
sible for operation, adjustment and maintenance.
Important: The fi xing screws may only be tighte-
ned to a point where they do not distort or deform
the base plate. Excessive tension can lead to
fracture.
5.3. Hinged chip guard (Fig. 5)
Unscrew the three screws (21).
Push the transparent cover (23) into the groove
of the red mounting frame (24) and fasten it again
with the screws (21).
The height of the cover (23) is infi nitely adjustable
and can be locked using both thumb screws (22).
The chip guard (13) can be fl ipped upwards to
change drill bits, however ensure that the chip
guard (13) is back in its initial position before rest-
arting the equipment.
5.4. Prior to starting
Ensure that the voltage of the mains supply com-
plies with the specifi cations on the rating plate.
Connect the machine only to a socket with the
properly installed earthing contact.
The table drill is equipped with a no-volt trip that is
Anl_BT_BD_701_SPK1.indb 21
Anl_BT_BD_701_SPK1.indb 21
GB
designed to protect the operator from an undesi-
red restart following a drop in voltage. Should this
occur, the machine must be manually restarted.

6. Operation

6.1 General (Fig. 2)
To switch on the equipment, push in the green
On button "I" (18); the drill starts up. To switch off ,
press the red Off button "O" (19); the drill shuts
down.
Ensure that you do not overload the equipment.
If the sound of the motor drops in pitch during
operation, it is being overloaded.
Do not overload the equipment to the point where
the motor comes to a standstill.
6.2. Inserting the tool (Fig. 1)
Make sure that the power plug is removed from
the socket-outlet before changing tools. Only cy-
lindrical tools with the stipulated maximum shaft
diameter may be clamped in the scroll chuck (10).
Only use a tool that is sharp and free of defects.
Do not use tools whose shaft is damaged or
which are deformed or fl awed in any other way.
Use only accessories and attachments that are
specifi ed in the operating instructions or have
been approved by the manufacturer. If the pillar
drill should become jammed, switch off the ma-
chine and return the drill to its starting position.
6.3 Using the gear rim chuck
Your pillar drill is equipped with a gear-toothed
drill chuck. In order to insert a drill bit, fl ip up the
chip guard (13), insert the drill bit, then tighten
down the drill chuck using the supplied chuck key.
Pull out the chuck key. Ensure that the clamped
tool is fi rmly seated.
Caution! Do not leave the chuck key in the clamp
hole. Doing so will cause the chuck key to be ca-
tapulted out, which could cause injury.
6.4 Use of tools with tapered shanks (Fig.
11/12)
The pillar drill comes with a spindle taper. To use
tools with tapered shanks (MK2), proceed as
follows:
Move the drill chuck to the lower position.
Eject the tapered shank using the supplied
drill drift (31), taking care as you do so to en-
sure that the tool does not land on the floor.
Insert the new tool with tapered shank (34) in
the spindle taper with a jolt and then check
- 21 -
22.11.2016 11:06:31
22.11.2016 11:06:31

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis