6. Commissioning, operation
6.9.2 Piston/Spring exit
Pack the exit orifice of the furnace wall with high-temperature ceramic fiber (kaowool)
insulation to keep outside connections cool. Install plate and spring, tighten collar at desired
location. Install split washers and pipe cap.
WARNING!
Ensure thermocouple transition does not exceed 175 °C (350 °F) and is a
minimum of 150 mm (6") from the furnace entry connection.
Spring-loaded style
Piston style
WIKA operating instructions model TC59-V (V-PAD
V-Pad_Spring_Piston_OI.ai
Existing
)
®
EN
Existing
17