Herunterladen Inhalt Inhalt Diese Seite drucken

Ordering Replacement Parts; Ordering Spare Parts - HERKULES SE 5000 DF Bedienungsanleitung

Diesel-stromerzeuger
Vorschau ausblenden Andere Handbücher für SE 5000 DF:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 9
Anleitung SE 5000 DF_SPK7:Anleitung STE 5000_D
to winter diesel and fill the tank with winter diesel
before the onset of outdoor temperatures of bet-
ween -3°C and -10°C.
If the diesel fuel still freezes, you must move the
diesel generator to a place where the temperature
is approximately +10°C for a period of approxima-
tely 12 hours.
If the tank is between halfway and full with normal
diesel fuel, this should then be drain as described
in point 9.4.
Then fill the tank with winter diesel.
If the tank is between empty and half-full, simply
fill it up with winter diesel.

11. Ordering replacement parts

Please quote the following data when ordering repla-
cement parts:
Type of machine
Article number of the machine
Identification number of the machine
Replacement part number of the part required
For our latest prices and information please go to
www.isc-gmbh.info
23.08.2007
14:41 Uhr
Seite 17
GB
17

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis