Herunterladen Inhalt Inhalt Diese Seite drucken

Danfoss TripleLynx 8 kW Benutzerhandbuch Seite 19

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 26
3. Web Server Quick Guide
3
Illustration 3.6: Step 5 of 7: Grid Code
Note:
If the initial and confirmation settings are different,
If initial and confirmation settings match, but are incorrect, contact service.
Step 6 of 7: Replication
To replicate the settings from steps 1 to 6 to other inverters in the same network
Note:
When the PV configuration, installed PV power and PV array area of follower inverters in the
network differ from that of the master, do not replicate. Set up the follower inverters individ-
ually.
Illustration 3.7: Step 6 of 7: Replication
18
grid code selection is cancelled
the wizard recommences step 5
Select inverters
Click [Replicate]
L00410310-07_2q

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis