Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Batteries - Spektrum AR9110 PowerSafe Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN
Installing the PowerSafe Main Unit
PowerSafe unit in the position that you would normally mount the receiver.
2. Mount the switch on the side of your aircraft and insert the switch plug
in the port in the main unit marked SWITCH.
Note: The PowerSafe uses a specifically designed switch.
Conventionally wired switches are not compatible with the SmartSafe.

Installing the Batteries

application and install the battery(s)/regulator(s) in your aircraft. Connect
the battery to the PowerSafe. Spektrum batteries are pre-wired with an EC3
connector and plug directly in. If using another brand of battery it will be
necessary to solder EC3 connectors (two are included with the AR9110)
to the battery leads. If using a regulator, install it per the guidelines
included with the regulator.
12

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis