Herunterladen Inhalt Inhalt Diese Seite drucken

Operation - Gardena 4000/5 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für 4000/5:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

4. Operation

Filling the pump:
6
7
1
5
1
1732-20.960.05.indd 15
1732-20.960.05.indd 15
DANGER! Electric shock!
Risk of injury due to electric shock.
v Disconnect from the mains before filling the
5
Garden Pump.
ATTENTION!
8
v Before each operation, slowly fill the pump with liquid
to be pumped until it overflows (approx. 2 to 3 l).
1. Open the cap
2. Fill the pump via the filler cap
approx. 2 to 3 l of the liquid to be pumped.
3. Tighten the cap
4. Open any shut-off valves in the delivery line (accessories,
water stop, etc.).
5. Drain remaining water in pressure hose
escape during the suction process.
6. Switching on pump 4000/5: Lift and hold the delivery hose
at least 1 m vertically above the pump, press the On/Off
8
switch
(On/Off switch shines) and wait until the pump has
primed.
v If the pump does not deliver after approx. 5 minutes,
switch off the pump (press On/Off switch
(see 7. Trouble-Shooting).
min.
6. Switching on pump 5000/5; 6000/6 inox:
1 m
Lift and hold the delivery hose
1 m vertically above the pump, insert the
power plug, press the On/Off button
(the LED shines green) and wait until the
pump has primed.
z
If the pump does not deliver within
approx. 20 seconds, the LED flashes
orange.
If the pump does not deliver: 5000/5
within approx. 5 minutes / 6000/6 inox
within approx. 6 minutes, the LED
shines red and the pump switches off
automatically (see "7. Trouble-
Shooting").
v If the pump does not automatically
switch off then manually switch
the pump off and check the hose
for leaks.
The specified maximum self-priming suction height of 8 m is
reached only if the pump is filled via the filler neck
overflow and if, while doing so and during the self-priming, the
delivery hose
medium escaping from the pump via the delivery hose
6
7
on the filler neck
7
to overflowing with
6
7
of the filler cap
5
at least
5
is held up sufficiently high to prevent any flow
by hand.
by hand (do not use pliers).
5
so that air can
5
8
)
LED
ß
8a
7
up to the
5
.
12.07.11 09:07
12.07.11 09:07
15

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

5000/56000/6 inox

Inhaltsverzeichnis