Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Preparing The Unit Connection - Oase ProfiClear Premium Gebrauchsanleitung

Individualmodul
Vorschau ausblenden Andere Handbücher für ProfiClear Premium:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
- GB -
4

Installation

The following tools are required:
10 mm ring spanner
7 mm socket spanner, 8 mm socket spanner
PZ3 Phillips screwdriver
Cordless drill/screwdriver with PZ3 bit (do not set to "drill"!)
4.1

Preparing the unit connection

Before installing, connecting and starting up the unit, perform the following tasks:
2 Remove 2× strainer baskets(
1 Fit 1× DN 75 slide valve (
2 Fit 2× ∅ 180 mm inlets (
2 Fit 2× DN 110 outlets (
2 Fit 2× 2" outlets (
Remove the container cover to perform the following work.
Removing the strainer baskets
How to proceed:
8.
E
1. Undo both locking mechanisms (turn through 90°).
2. Lift out the strainer baskets
Fitting the DN 75 slide valve
How to proceed:
3.
F
1. Fit the slide valve into the connecting sleeve and secure with a hose clip.
2. Fit the connecting sleeve onto the connection.
3. Secure the holding plate of the slide valve to the outside of the container with cap nuts.
4. Secure the hose clip on the connection.
Fitting the ∅ 180 mm inlet
How to proceed:
5.
G
1. If not already done: Fit the seal into the wall of the container from the outside. Ensure that the hole
pattern of the seal is aligned to the hole pattern of the container.
2. Fit the inlet to the seal.
Ensure that the raised marking is at the top and aligned in relation to the hole pattern.
3. Fasten the seal and inlet from the inside with oval head screws.
Tighten all screws diagonally using the cordless screwdriver to ensure that the sealing ring is
uniformly applied. Further tighten the screws using a Phillips screwdriver.
22
19397-07-13_GA_ProfiClear_Premiu22 22
A 3)
A 7)
A 8)
A 4)
A 5)
25.07.2013 11:48:40

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis