Herunterladen Inhalt Inhalt Diese Seite drucken

Homa TP 28 Originalbetriebsanleitung Seite 60

Vorschau ausblenden Andere Handbücher für TP 28:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Current under load:
U1________Amp.,>U2________Amp.,>Z2________Amp.
U1: highest reading (Should be)
U2: middle reading
Z2: lowest reading
Lead U1 (common) should have the highest current read-
ing. Lead Z2 (start) should have the lowest reading.
If Z2 current draw is greater than the current draw of ei-
ther U1 or U2, a smaller size Run capacitor (lower micro-
farad rating) is required to correct the condition. Example:
If a 60 µf Run capacitor was supplied, change to a 50 µf
Run capacitor and check current readings. Typically, only
one step down in capacitor size is required, but in certain
instances 2 steps may be required.
( ) The standard capacitor kit provided includes:
____________ µf start capacitor
____________ µf run capacitor.
( ) Additional run capacitors have been included for use
in tuning the pump to match available line voltages for
optimum performance.
____________ µf run capacitor
____________ µf run capacitor
____________ µf run capacitor
This form is provided for your use in optimizing the perfor-
mance and service life of your single phase pumps, and is
applicable to most Capacitor Start/Capacitor Run motors.
Please contact our customer service with any questions
or if you require any additional information or assistance.
60 | EngliSH

Werbung

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Tp 30Tp 49

Inhaltsverzeichnis