Herunterladen Inhalt Inhalt Diese Seite drucken

Fuse Replacement; Spare Parts; Environmental Notice - Benning PV 1-1 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für PV 1-1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

9.5 Fuse replacement

Before opening the BENNING PV 1-1, make quite sure that it is voltage free!
c
Electrical danger!
The BENNING PV 1-1 is protected against overload by means of one built-in fuse (500 mA,
1000 V, F, D = 6.3 mm, L = 32 mm) (P.no.749771).
Proceed as follows to replace the fuse (see Figure 10):
-
Switch the BENNING PV 1-1 off.
-
Put the BENNING PV 1-1 face down and unscrew the screw of the battery compartment
cover.
-
Lift off the battery compartment cover (in the area of the housing slots) from the bottom part
of the battery compartment.
-
Laterally lift one side of the defective fuse off the fuse holder by means of a slotted screw-
driver.
-
Completely remove the defective fuse from the fuse holder.
-
Insert the new fuse. Only use fuses of the same nominal current, nominal voltage, nominal
breaking capacity, tripping characteristic and dimensions.
-
Lock the battery compartment cover into place on the bottom part and tighten the screw.
See figure 10:
Battery/ fuse replacement
9.6 Calibration
To maintain the specified precision of the measurement results, the instrument must be recali-
brated at regular intervals by our factory service. We recommend a recalibration interval of one
year. Send the appliance to the following address:
BENNING Elektrotechnik & Elektronik GmbH & Co. KG
Service Centre
Robert-Bosch-Str. 20
D - 46397 Bocholt

9.7 Spare parts

Fuse 500 mA, F, 1000 V, breaking capacity ≥ 500 A, D = 6.3 mm, L = 32 mm, P.no. 749771

10. Environmental notice

At the end of the product's useful life, please dispose of it at appropriate collection
points provided in your country.
09/ 2012
BENNING PV 1-1
22

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis