4. Installation guidelines

1. Place of installation
The appliances cannot be operated at place where there are ignitable gas, air or
gas/air combinations (e.g. petrol pumps, paint workshops, etc.) and also not where
they can suck in small combustible parts, that can be lighted up at the heating coil and
blown out as glowing sparks (e.g. straw, paper, sawdust and wood shavings, etc.)
The appliance cannot be connected to air conduits or hoses. The device should not be
exposed to heavy dust emissions. Dust deposits on the PTC heating element can
cause a short circuit in connection with humidity.
2. Installation
Electric heaters cannot be operated in the immediate proximity of bathtubs, wash
basins or swimming pools.
3. Safety distances to combustible parts:
On the side: 0.60 m
Suctioning side: 0.20 m Upwards: 2.00 m
Do not cover electric heaters with textiles!
Floors and ceilings must be fire resistant. Suctioning and blowing out pipes should
not be narrowed.
4. When using on a construction site, the safety guidelines of the professional
construction associations must be maintained.
5. When using in agriculture, the regulations of the agricultural professional
associations and property insurers apply.
6. Legislation: the following regulations must be observed when installing and starting
up:
Work place ordinance §§ 5 und 14
Work place directive ASR 5
Accident prevention regulations VBG 43
available at: German Information Centre for Technical Regulations (DITR) at DIN,
Burggrafenstraße 6, 10787 Berlin).
7. The appliance cannot be operated under wall sockets.
8. The appliance cannot be operated by a programmable timer without supervision.
Blow out side: 2.00 m